Work report — Austin & Central Texas

Standing Seam: Preparing the Plane

A metal roof is decided before the first panel is carried up the ladder.

PropertySan Marcos, TX — single-story ranch
Job typeRoof replacement — shingle to standing seam
Condition addressedAn existing rear addition whose roof plane was not true
PanelsStriated standing seam, concealed clips
ScopeTear-off · addition roof opened and framing corrected to bring the plane true · re-decked · high-temp self-adhered underlayment across the entire roof · standing seam panels set on manufacturer clips · hips, ridges and terminations formed on site

What standing seam asks of the roof underneath it. A shingle roof forgives its substrate. Shingles are small, textured and matte, so a deck that waves a little reads as texture from the ground and nobody ever knows. Standing seam forgives very little. A metal pan is a long flat plane with a reflective finish, and every high spot, low spot and twist in the framing below tends to telegraph through it as oil canning — the visible waviness that homeowners notice first and mention longest. It is not a flaw in the metal. It is the substrate showing through the metal.

What we found. This house had a rear addition we did not build. When the roof came off, the plane over that addition was not true — the framing beneath it did not hold a consistent line across the run. Under shingles nobody would have seen it. Under metal it would have been permanent, obvious, and visible from the driveway on day one.

What we did about it. Opened the addition, corrected the framing to bring the plane true, and re-decked over it — all before any underlayment went down. That work is the reason the finished pans in the last photos read flat. It is also the part of the job that nobody can see once the panels are on, and the part that cannot be gone back and fixed later.

Client name and address withheld.

The work, in order

The addition opened. Decking off, original framing exposed — irregular members at irregular spacing, which is why the plane above it never ran true.
01The addition opened. Decking off, original framing exposed — irregular members at irregular spacing, which is why the plane above it never ran true.
Framing corrected across the run, with the mechanicals in the cavity worked around rather than over.
02Framing corrected across the run, with the mechanicals in the cavity worked around rather than over.
New members set to a consistent line, so the deck above them has something straight to land on.
03New members set to a consistent line, so the deck above them has something straight to land on.
Re-decking over the corrected framing, with the completed section already underlayed at the bottom of frame.
04Re-decking over the corrected framing, with the completed section already underlayed at the bottom of frame.
The eave built out and squared — a metal edge shows a crooked line the length of the house.
05The eave built out and squared — a metal edge shows a crooked line the length of the house.
Deck complete and flat. This surface is what the finished roof will look like.
06Deck complete and flat. This surface is what the finished roof will look like.
High-temp self-adhered underlayment across the entire roof. The manufacturer permits panels direct to deck over synthetic; this was an upgrade, because a metal roof runs far hotter than a shingle roof and the underlayment has to survive it.
07High-temp self-adhered underlayment across the entire roof. The manufacturer permits panels direct to deck over synthetic; this was an upgrade, because a metal roof runs far hotter than a shingle roof and the underlayment has to survive it.
Panels going on over the membrane, run plane by plane.
08Panels going on over the membrane, run plane by plane.
The panel edge against the underlayment — striated pan, concealed seam, set on the manufacturer’s standing seam clips.
09The panel edge against the underlayment — striated pan, concealed seam, set on the manufacturer’s standing seam clips.
Hips and ridges closed as the planes come together. On a hip roof every panel meets a cut line, and every cut line is visible for the life of the roof.
10Hips and ridges closed as the planes come together. On a hip roof every panel meets a cut line, and every cut line is visible for the life of the roof.
Panel terminations at the hip, cut and closed into the cap.
11Panel terminations at the hip, cut and closed into the cap.
The hip cap run out clean and straight.
12The hip cap run out clean and straight.
Complete. The large plane on the left is the addition — the section whose framing was corrected before anything else happened.
13Complete. The large plane on the left is the addition — the section whose framing was corrected before anything else happened.
The pans read flat in full sun across their length. That is the framing underneath, not the metal.
14The pans read flat in full sun across their length. That is the framing underneath, not the metal.
Hips, valleys and planes closed out across the roof.
15Hips, valleys and planes closed out across the roof.

Recap

What went into this roof, and what each decision was for.

DetailCondition foundRebuilt as — and the reason
The planeThe existing rear addition’s framing did not hold a true line across the run.Framing corrected and the section re-decked before any underlayment. Metal telegraphs whatever is beneath it; a plane not fixed at this stage cannot be fixed later.
UnderlaymentThe panel manufacturer permits direct-to-deck installation over synthetic underlayment.High-temp self-adhered was used instead, across the entire roof. A metal roof runs far hotter than a shingle roof, and under panels the underlayment is the layer that has to last.
Panel attachment—Standing seam clips as required by the panel manufacturer — concealed, and allowing the panels to move with temperature rather than being pinned through the face.
Panel profile—Striated pans. The fine ribs in the flat of the panel stiffen it and break up the reflection that reads as oil canning.
VentilationGable vents on each side serve as both intake and exhaust. The original construction had exposed rafter tails and no intake ventilation.Existing arrangement, unchanged by this work, and noted here so its condition is on the record.

The part you can see from the street

Nearly everything a homeowner will judge about a standing seam roof — whether the pans look flat, whether the lines run straight, whether the hips are clean — is decided by work that is buried before the first panel goes on. The metal is the easy part. Squaring an eave, truing a plane and landing a deck flat is the part that takes the time, costs the money, and disappears completely.

Scope note. This report covers the roof work performed on this project. Conditions not opened were not inspected.

About this report. These photographs were taken during this project and show selected stages of the work. This report records what was done on this job and what was found. It is not an inspection certification, a condition report, or a warranty, and it does not add to or change the scope of any agreement. Scope, materials and methods on any project are set by that project’s signed estimate and contract. Conditions not opened were not inspected, and nothing here is a warranty or guarantee of future performance on any other property.